[ad_1]
Last update:
Vishnupad Corridor: A potential digram has been released by Bihar State Tourism Department. The tourism department of the Government of Bihar spent about Rs 62 crore for the renovation and beauty of the Vishnupad temple.Read more

Last year, in the Union Budget, there was an announcement about the corridor in Gaya’s Vishnupad. Now the construction work of the corridor is going to start soon. A potential diagram has been released by the Bihar State Tourism Department regarding this. 61 crore is being spent by the tourism department of Bihar government for the renovation and beauty of Vishnupad temple. Maps and format related to development schemes have been made by the tourism department.

Three entrances connected together will be built under this project. The total height of the middle gate is about 14 meters and the height of both sides will be about one meter less. All the doors will be covered with Sandstone and GRC, which will be designed and carved. Apart from this, many other works related to development and beautification will be done under this project. Path-way, shed building and optional access path will be built in the first phase. At the same time, the main entrance of the temple will be from the river Falgu.

This project will develop two areas including Vishnupad Temple. In the development works along with Vishnupad Temple, construction of a visitor facility center in front of the temple, construction of a grand entrance for the temple near Falgu River, construction of 140 feet wide route from Ghat to Visitorial Facilitation Center, three sets of toilets and change rooms, tourist convenience center complex, tourist convenience center complex, construction of a tourist convenience center, bus stand under the complex, nearly 1.28 acres of land development, other acres of land from the bus stand, other acres of land from the bus stand, the bus stands from the bus stand to the Phalgu Ghat parking Construction is mainly included.

About 36.47 crore rupees will be spent in beautification and building construction, 6.47 crore in site development and boundary wall, about 1.7 crore in Pathway Development, 2.2 crore in internal electrical, solar power generation system, 7.29 crore rupees in GATE works. 57.74 crore rupees will be spent for Vishnupad Temple Corridor. Apart from this, there will be 4 crore 22 lakh rupees and expenses, which have been reported to be the expenses of various service. In this way a total of 61.96 crore rupees will be spent.

Muktidham will also be included inside the corridor by Bihar State Tourism Department in Diagram. There is also a plan to beautify the temple of Mashan Baba located in Muktidham. However, after the involvement of Muktidham in the corridor, the process of funeral will be about two hundred yards ahead. For the grandeur of the world famous Shri Vishnupad, the marriage will break in front of Shri Vishnupad. A two -storey road gate will be constructed here. Vishnupad gate will also be built near Gayasir altar. From here, the pilgrims will enter the Vishnupad temple.
[ad_2]


